Final assembly and first engine runs

It's been a busy week since moving to the airfield.  The aircraft has been assembled, controls rigged, avionics ground-tested and the engine run for the first time!

So a brief review.  First the final assembly and control rigging.


Here I've clamped the rudder between two pieces of plywood so I can mark and drill the rudder cable links. 

Here I've installed the anti-servo tab control arm and pitch trim actuator.   

This is a view of the trim actuator try and push-rod. There is no manual trim so if the electrics or trim motor fail, the trim will be locked in the last position. 



A view inside the aft fuselage of the tensiometer on one of the stabilator cables.  Both cables have to be tensioned to 35-45 lbs and at the set time, adjust the upper and lower cables to get the correct range of movements.  A bit fiddly and time-consuming.

So next was installation of the propellor.  I had previously installed it at home to get the spinner aligned and the pitot tube fitted, but hadn't tried setting the blade pitch angles.  

A view of the inclinometer showing the propellor blade pitch using the Vans'supplied alignment tool.  It took a while to get both blades to the same angle (71.4 degrees specified by Vans).  Before ground running, Jerry checked the blade-tip  run-out for me and it was fine.

Next came the wings.  I had some work to complete with the AoA sensor installation on the left wing as well as fittng the registration letters.  I also had to remove the blue plastic and clean off all the sharp points from the pop rivets.

 Left wing on trestles all cleaned and ready for the registration, with the right wing on the transport stand with just the blue plastic to remove from the flaperon.

 Final registration letters fitted on the underside of the left wing.  These are temporary stickers just for the test flying phase and the proper versions will be sprayed as part of the aircraft painting in the new year.

Any finally a complete aircraft with all controls installed and correctly rigged.   In fact I had to take the wings off again to trim the flaperon skins where they were rubbing on some fuselage rivets, and to correct a problem with the stall warning connection.  I had crossed 2 pins at the wing-root connection so had a permanent stall warning alert on the PFD.

With aircraft all assembled, the next job was to leak check the fuel tank and pipework and then carry out a fuel-flow check to ensure the electric pump delivers the required volume.  There we no leaks so I put on 10L of unleaded car fuel and performed the flow checks.  Three tests of 15 seconds each and one of 60 seconds confirmed an average flow of 104 litres/minute, which is fine.

This is the fuel flow set-up with a temporary pipe connected to the output port of the mechanical pump and running into a calibrated 3L jug.

With fuel checks done, I drained (pumped out) the unleaded car fuel and had the first 30 L load of Avgas from he airfield bowser ready for round runs.
Jerry came to do the post-assembly inspection and ground runs, so after  a bit of additional wire-locking and priming the oil system, we went outdoors for the first time to give the engine a try.



After a first test with the ignition off the ensure the engine rotated, it fired at the first attempt.  A little more choke and it was away!  


A screenshot of the PFD showing all of the engine parameters correctly indicating.

We then performed the carburettor balance using Jerry's test kit and my first chance to get in and run the engine whilst Jerry made the adjustments.  On completion, the engine runs extremely smoothly and has a ground max RPM of 5040 and an idle of 1500, so all good for flying.  The final bit for the session was to see how well it taxi's and test the brakes.  We had a small try in front of the hangar and then went for a loop around the taxiway, down the runway at 35 kts and back to the hanger. 

Yours truly putting the aircraft away.  It was a rainy day but worth getting wet!     All in all and excellent day and lots of thanks due to Jerry for his guidance and support.





Tuesday 11 September 2018

Moving day!

The aircraft finally moved to Fairoaks today.  Hassle-free fortunately and with many thanks to Jon and Dave for their time and to Dave for supplying the trailer and his Landrover.

First the fuselage.  As you may notice, the aircraft wheelbase is slightly wider than the trailer bed, making for interesting loading!  It worked fine with some sheets of plywood I had lying around.   Dave had brought an extra ramp with the trailer so that sorted the nose-wheel.  It got the attention of the neighbours and plenty of looks as we drove to the airfield.

 Arrival at Fairoaks - just got to negotiate the air side gate.

Second trip - this time the wings and horizontal stabiliser.  I hadn't considered using the wing rack for transport as I only made it for easy storage and rolling around the garage.  With one extra brace and well secured with straps it did the job fine.  The stabilator is on the bed of the trailer beneath the wings and wrapped in garden chair cushions and a blanket!

 Wings on their way.

 I made another trip by car to deliver the fin and rudder along with tools and boxes of parts.  Then immediately on to assembly with the empennage.

End of the day, with the RV12 in it's proper home and starting to look like a complete aircraft.  I have the anti-servo tab to install and then to connect the trim servo, rudder and elevator cables and do the rigging and tensions.